The hallway stuccoed wall. Still drying but the room is useable if we keep everything off the stucco walls.
The wall between the boys and girls rooms. Papa is putting the boys side of this wall in as I type.
The outside wall after we moved the girls in. There is a good foot between the bed and the stucco wall. Air circulation is import to the curing process.
The fourth wall in their room. The laundry room is on the other side of this wall. The filing cabinets will find another home when all the walls are done. The girls are super excited to sleep in their room tonight! The boys will probably move into theirs tomorrow morning. They've all been sleeping in the living room for almost a month. Not so shabby considering Papa re built their walls, wired the walls, prepped them for stucco and stuccoed them. Oh he also built the hallway walls, wired them, prepped them and stuccoed them. A good months work. Next is the back outside walls first coat of stucco and the Farmer Bathroom.
No comments:
Post a Comment