So work on the house has re-started. Papa has; put in these lovely doors (master bedroom and bathroom),
And this bedroom door,
Built this wall and installed the electrical panel and doors (still need staining but he wanted to make sure they fit),
Here it is from the kitchen side,
Built all the interior walls :) (this picture is looking into the two side by side bathrooms and the master bedroom down at the end. The door on the right is the on-suite bathroom door.)
And I took all the doors off the kitchen cupboards and removed the hardware and started sanding them (loving the belt sander btw)
I've got the first rough sanding on the doors, and a couple small cabinets, done. Next job a fine sanding on the doors and staining the doors. Painting the cabinets needs to wait until we get a bit warmer temperatures. Oh and this is not the final placing of the kitchen cupboards. :) The sink is in its spot though :)
We also spent a day in the city buying supplies, researching others and stocking up on groceries and buying needed footwear for kids :). The kids are still doing school full time and so my time is split between the daily grind and the sanding.
This week we'll be working on plumbing, wiring and kitchen doors.
Some of the supplies we got in the city. I'll admit I'm super excited about toilets, light fixtures and all of the little things that make up a house!